Cabling Installation & Maintenance Silver Innovators Award Winning Design

I was the lead engineer in charge of all research, design, testing, and validation for a new $3.8M international fiber enclosure product line launch taking designs all the way through launch phase.

This included:

  • FEA Analysis
  • Design and management of over 80 parts in Solidworks and PDM
  • Cost estimation
  • Detail component and assembly drawings following GD&T (ASME Y14.5 )
  • Interface control documents
  • Bill of materials management
  • Tolerance stack up analysis
  • Working with international manufacturing plants (Mexico) for Pilot Build
  • Writing detailed test procedure and test report documentation following ISO 9001 standards